Download Latest (June) Citrix 1Y0-259 Practice Test 1-10

Ensurepass

 

QUESTION 1  (Topic 0)

 

Which step is required to obtain the license file when implementing Citrix Presentation Server 4.5 after installing the Citrix License Server?

 

A.

Download the license file from MyCitrix.com and upload it to the License Management Console through the License Files node.

B.

Download the license file from MyCitrix.com and upload it to the License Management Console through the File Locations node.

C.

Download the license code from MyCitrix.com and enter it in the License Management Console through the License Files node.

D.

Download the license code from MyCitrix.com and enter it in the License Management Console through the File Locations node.

 

Answer: A

 

 

QUESTION 2  (Topic 0)

 

Client network printers __________. (Choose the appropriate phrase to complete the sentence.)

 

A.

always route through the client device

B.

can have routing configured within printer management properties

C.

can have routing configured by means of the print job routing policy

D.

always route directly from Presentation Server to the network printer

 

Answer: C

 

 

QUESTION 3  (Topic 0)

 

Scenario: An administrator installed Microsoft Word into an application isolation environment named “AIEMSWORD”. The administrator then configured the server properties to not use the farm settings for the application isolation environment. The User Profile Root is set to “%APPDATA%CitrixAIEaiemsword”. The administrator uses a test user account, “usertest”, to run AIERUN on the console. What is the correct location for the modified files inside the application isolation environment?

 

A.

usertestCitrixAIEaiemsword

B.

%username%CitrixAIEaiemsword

C.

Documents and Settings%username%CitrixAIEaiemsword

D.

Documents and SettingsusertestApplication DataCitrixAIEaiemsword

 

Answer: D

 

 

QUESTION 4  (Topic 0)

 

Scenario: A company has one remote office. Users in the remote office access published applications on servers running Presentation Server over a WAN connection and often are troubled with latency and bandwidth issues. The administrator has created a policy to address the latency and bandwidth issues and wants to apply the policy to client IP addresses that correlate to the ranges assigned to client devices in the remote office. Which three steps are required to apply the policy? (Choose three.)

 

A.

Apply the policy at client log in.

B.

Select the Client IP address filter.

C.

Apply the filter to all client IP addresses.

D.

Specify start and end ranges for IP addresses.

E.

Apply the filter to a select range of client IP addresses and allow access.

 

Answer: BDE

 

 

QUESTION 5  (Topic 0)

 

Scenario: An administrator plans on deploying the Program Neighborhood Agent Client to a group of pilot users. The environment consists of three server farms. How will these three server farms be designated?

 

A.

Users will select the server farm names when logging in the first time.

B.

The administrator will specify the server farms in the Presentation Server Console.

C.

The administrator will specify the server farms in the Access Management Console.

D.

Users will designate the server URL of the Citrix XML Service server when logging in the first time.

 

< span lang="EN-US" style="font-family: ; mso-no-proof: yes">Answer: C

 

 

QUESTION 6  (Topic 0)

 

 

 

 

Scenario: Users in the Accounting department experience delays when attempting to launch Microsoft Excel. As a result, users tend to open multiple copies of the application, as they click multiple times on the application icon before the application finally launches. Which SpeedScreen solution should the administrator configure to optimize the user experience and how?

 

A.

SpeedScreen Latency Reduction, disabling Mouse Click Feedback

B.

SpeedScreen Browser Acceleration, adding Microsoft Excel to the list of applications in the policy

C.

SpeedScreen Browser Acceleration, customizing its settings at the farm level for accounting users

D.

SpeedScreen Latency Reduction, testing all aspects of Microsoft Excel in a non- production environment

 

Answer: D

 

 

QUESTION 7  (Topic 0)

 

What must be available in the Presentation Server environment before applications can be deployed by Installation Manager onto the server?

 

A.

Resource Manager

B.

Appropriate licenses

C.

Installation Manager Packager

D.

Citrix Access Management Console

 

Answer: B

 

 

QUESTION 8  (Topic 0)

 

Scenario: An administrator plans to enable workspace control within a company. The security manager agreed to the implementation so long as a user session cannot be transferred from one device to another without the user taking some proactive action. What should the administrator do to comply with the security manager?

 

A.

Allow users to customize workspace control.

B.

Implement workspace control for all sessions.

C.

Enable the “Prompt user” setting for workspace control.

D.

Implement workspace control for disconnected sessions only.

 

Answer: D

 

 

QUESTION 9  (Topic 0)

 

Scenario: An administrator is configuring printing for a new call center. All the printers in the call center are connected to a network so that they can be accessed as shared resources. The administrator wants to configure a policy so that print jobs go directly from the server running Presentation Server to the print server. Which two policy rules should the administrator configure in order to meet the requirements for the call center printing policy? (Choose two.)

 

A.

Universal driver

B.

Print job routing

C.

Session printers

D.

Legacy client printers

 

Answer: BC

 

 

QUESTION 10  (Topic 0)

 

An administrator needs to create a printing policy for client printers so that print jobs are sent directly to a network print server. Which policy rule must the administrator configure?

 

A.

Print job routing

B.

Network print routing

C.

Client printer mapping

D.

Client printer redirection

 

Answer: A

 

Free VCE & PDF File for Citrix 1Y0-259 Real Exam

Instant Access to Free VCE Files: CompTIA | VMware | SAP …
Instant Access to Free PDF Files: CompTIA | VMware | SAP …

This entry was posted in 1Y0-259 Practice Tests (June) and tagged , , , , , , . Bookmark the permalink.